Projects

Dam Refurbishment Within The Grounds Of A Country House Estate

A complex project that required extensive planning. The project consisted of the refurbishment and upgrading of the a series of three dams and the connected waterways.

The project duration was 12 months with a high level of attention to detail and quality of the materials being used.

CONSULTANTS

Property Pathfinder's Role:
Project Management, Construction Management, Contract Administration

Structural Design:
Infrastructure Design Studios

Contractor:
Cotswold Meadows Ltd

1. Headline 5 8 9 51C5BACF-5654-4017-81DF-DE251D297E6B 2232 2334 23545 IMG_0543 IMG_1858 IMG_1864 IMG_2124 IMG_2171 IMG_2473 IMG_2924 IMG_2986 2 IMG_2986 IMG_7074 IMG_7215 IMG_7471 IMG_8612

Return

Contact us here to talk to us about your next project.